Connected
on every side
Thagarapuvalasa, on the Venkatapuram–Padmanabham Road in the Bhogapuram growth corridor, about 20 minutes from Alluri Sitarama Raju International Airport.
Drive times
- Avanthi College9 min4.3 km
- Oakridge School10 min4.5 km
- Raghu College15 min9.5 km
- ANITS · NRI Medical20 min8 km
- Airport20 min17 km
- Anandapuram Jn (NH-16)23 min16.8 km
- IIM Visakhapatnam23 min16.3 km
- Bheemili Beach24 min11.7 km
- Google AI Hub39 min
Driving times and distances from the site by Google Maps, checked 21 Oct 2026; they vary with traffic.
Get directionsThagarapuvalasa,
Visakhapatnam
- Alluri Sitarama Raju International Airport, Bhogapuram – about 20 minutes (17 km)
- National Highway (NH-16) access – seamless connectivity to major destinations
- Oakridge International School and other reputed educational institutions within easy reach
- About 40 minutes from the Google AI Hub at Tarluvada, a major technology and investment zone
- Convenient access to hospitals and healthcare facilities
- Surrounded by a rapidly developing business and commercial corridor
- Close to leading engineering colleges and universities
- Premium hotels and hospitality destinations nearby
- Quick access to the Bheemunipatnam (Bheemili) beach corridor

Demand is arriving
faster than supply
Unsold homes across India’s top seven cities rose to about 6.3 lakh in July–September 2026, up 12% in a year, as new launches outpaced sales. In Vizag it is the other way round: new infrastructure is arriving faster than new homes.1
- US$125–135 bn3Visakhapatnam Economic Region GDP target by FY32, from about US$52 bn
- US$15 bn4Google AI Hub investment, 2026–30, under construction at Tarluvada
- ~20,0005IT jobs planned at the TCS and Cognizant campuses
- ~52,0002Jobs estimated from the data-centre ecosystem
- Jul 20286Google AI Hub campuses expected to be operational
- 20267New international airport and railway zone HQ open
With the airport, the Google AI Hub, the IT campuses and the railway zone arriving together, Vizag offers the room for growth that the saturated metros no longer do, and Serene Meadows sits in its northern growth corridor.
- ANAROCK, top-7 cities housing update, Q3 (Jul–Sep) 2026.
- Data-centre ecosystem study cited by the Government of Andhra Pradesh (PTI, 6 Aug 2026); it estimates about 2.33 crore sq ft of housing needed.
- Visakhapatnam Economic Region Economic Master Plan (NITI Aayog-linked), reported Feb 2026.
- Google announcement, 14 Oct 2025; groundbreaking at Tarluvada, 28 Apr 2026.
- TCS: up to 12,000 jobs (AP cabinet land allotment, Apr 2025). Cognizant: 8,000 jobs (foundation stone, 12 Dec 2025).
- DatacenterDynamics, 28 Apr 2026: the hub’s campuses are expected to be operational by July 2028.
- Airport commercial flights from 17 Aug 2026; South Coast Railway zone HQ from 1 Jun 2026.
Figures are reported estimates, targets or announcements as at October 2026, not a promise of future returns. Planned projects depend on government approvals and timelines.
